Homepage | Set Home | Add to Favorites
Member

Shenzhen IVS Flow Control Co.,Ltd


Products
  • No Category
Search
 

Friends links
  • No link

PR2 Valves Test System
Click image to view full size image
Product: Views:430PR2 Valves Test System 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-13 12:26
  Inquiry
Details

Shenzhen IVS Flow Control Co.,Ltd is one of the leading pr2 valves test system manufacturers and suppliers in China, welcome to wholesale customized pr2 valves test system from our factory.

Standard:

  • API 6A

  • Application:
    High/Low temperature test system is mainly designed to perform high & low temperature performance test on PR2 valves and wellhead equipment.
    Testing types: strength test, gas leak test, dynamic open/close cycling pressure test at maximum/minimum temperature, valve body pressure/temperature cycling test, and operation force or torque measurement;

    Technical Data:

  • Test medium: N2.

  • Test pressure: 0~140MPa.

  • Constant pressure range: 5%~100% FS.

  • Testing temp.: -59℃-121℃ *(or on request).

  • Temp. variation: ±2℃.

  • Pressure measuring accuracy: ±0.5% FS.

  • Pressure control precision: ±1% FS.

  • Torque measuring range: 200Nm~1500Nm *(or on request).

  • Drive air supply: 0.5MPa≤P≤1.0MPa.

  • Power supply: AC380V/50Hz.

  • Features & Benefits:

  • Independent and separate pressure testing, detecting and controlling to upstream and downstream of valves.

  • Electro-motor for small torque valves’ operation; hydraulic-motor for big torque valves’ operation.

  • Custom H/L temp. test chamber guarantees the needs of specimen loading and handling spaces.

  • Specimen loading method: vertical top loading & side loading.

  • Automatic test fully controlled by PC+PLC. Manual operation is on standby (pushbuttons).

  • High speed data acquisition support real-time display of pressure, time and torque, etc.

  • Test results saved automatically and allowed to print out for a further analysis.

  • Remote control & monitor of testing process is available, and unmanned testing site maximize the safety operation of operators and facilities.

  • Automatic alarm and emergency shutdown against pressure drop/leaks, over-temperature, power-down & over-load, etc.

Inquiry